VINEYARD, WORKSHOP AND STAFF QUARTERS IN THE METROPOLITAN GREEN BELT 


An established vineyard in the Metropolitan Green Belt had a run down shed for working activities which was less than adequate by today‚Äôs standards. A replacement building was under construction without planning permission when we were called in to help.


We successfully obtained retrospective planning permission for this building which was a slightly larger workshop with the addition of amenities such as toilet facilities for staff and a adequate space to operate in. 


The workshop was designed and constructed by local craftsmen at Herts of Oak (www.hartsofoak.co.uk)